Attached lower and upper longerons to RH aft side skin and pilot drilled all holes. Aligned and pilot drilled vertical channels #2 – #5 on both LH and RH aft side panels. Waiting on parts to pilot drill #1 vertical channels and splice plates. Left out hardware for now. Top edge of vertical channels aligned 1/4″ below top of top longeron as pictured. Rudder cable holes appear to line up correctly.








Hours Worked: 3.52