Flipped fuselage tail cone onto side and began up drilling fuselage floor to #30. Left forward lower corners of floor and #1 lower cross tie at pilot size to be completed when backordered fuselage conversion parts arrive. Up drilled AN525 holes in fuselage floor, longerons, and F23-03 forward lower mount angle per both plan sets. Temporarily removed aft fuselage floor for turtle deck installation




Hours Worked: 0.90
Leave a Reply