Fuselage Side Panels – Part 1

Located and pilot drilled lower longerons on LH/RH fuselage side assemblies. Located and clecoed upper longerons and miscellaneous side angles to fuselage sides. Determined -11L/R Gear Attach Angles had pilot holes drilled in wrong spot so remade them from 1x1x0.125×96 6061 angle.

Hours Worked: 2.90


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *