Began prepping wheel assemblies by using large socket to fully set wheel bearing races into rim halves. Prepped tires and tubes by removing Schrader vale and applying talc to tire and tube. Assembled wheel assembly with new bolts from hydraulic brake kit and brake disk. Torqued wheel rim to 15 ft/lbs and inflated assembly to 30 psi to set bead. Ensured tube was not caught between wheel halves, re-installed Schrader valve, then inflated to 30 psi. Temporarily mounted tires to axles to ensure bearings were square. Visual check passed.





Hours Worked: 2.22
Leave a Reply