Wing Rigging – Part 1

Removed forward tunnel zee and forward wing attach angles from fuselage. Updrilled alignment holes in forward and aft spar tunnels to 5/8″ to facilitate rigging bolts. Removed wing root doubelers from wings in preparation for wing rigging procedure. Began process of leveling fuselage by putting tail on a saw horse and then shimming L/R main tire for lateral levelness. After mains were shimmed with scrap aluminum, shimmed sawhorse legs for longitudinal levelness. Cut F02-02 spar bumper stock down to size per plans.

Hours Worked: 2.37


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *