With forward skin up drilled and clecoed into place, transferred pitot mount main hole and doubler plate rivet holes into forward skin. Also drilled 1/4″ pitot mount bracket holes in doubler and forward skin. Cut out 4″ diameter access hole between #4 and #5 rib. Plan to mount pitot control box on outboard side of #4 rib.


Hours Worked: 1.75
Leave a Reply