Finished up RH wing assembly by riveting forward wing skin onto wing. Started with top side, riveted entire side (starting at main spar then working to leading edge) then flipped wing and repeated process on bottom side. Left forward-most row of rivets on top side until bottom side of wing skin was clecoed into place. Drilled holes for pitot tube inspection cover and installed on lower side of leading edge skin. RH wing skinning complete!





Hours Worked: 4.10
Leave a Reply