Pilot drilled and clecoed bottom side of forward wing skin to LH wing. Forward-most row of holes to go


Hours Worked: 1.92
Build Log for Sonex 0849B
Pilot drilled and clecoed bottom side of forward wing skin to LH wing. Forward-most row of holes to go
Hours Worked: 1.92
Leave a Reply