Creation of F23 miscellaneous parts per legacy plans. Made -02 bulkhead from .032 sheet rather than blank due to not knowing it was available until it was too late. Channel cut with hole cutter. -03 and -04 angles cut on bandsaw, bent to 95 degrees, and holes cut with step bits. -05L/R mount assembly parts created and assembled. Accidently riveted all fitting holes and needed to drill out some of the first three rows of rivets.






Hours Worked: 6.63
Leave a Reply