Fuselage Box Assembly – Part 9

Continued final assembly of tail cone. Started by clecoing lower cross ties and aft angle. Riveted aft angle and lower cross tie #5 in order to install aft Shear Web Assembly. Riveted shear web to aft bulkhead and lower aft angle. Un clecoed upper longerons to slip in shear Web Assembly and clecoed into place. Disassembled tail post and clecoed mount angles into place. Fit tail wheel mount into place and torqued bolts to spec. Upper bolts in tail mount not torqued pending vertical stabilizer installation. Riveted tail section minus left side of tail channel pending rudder hinge half. Finished riveting lower cross ties then riveted upper cross ties. Riveted rear elevator pushrod mount to #4 cross ties. Also riveted seatbelt mounts to aft tail cone..

Hours Worked: 4.67


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *