Forward Fuselage Assembly – Part 1

Clecoed left and right forward side panels to aft side skins. Removed clecoed from #1 lower cross tie and aft fuselage floor and aligned lower forward skin to existing holes. Clecoed forward and aft fuselage floors to cross tie then pilot drilled lower longerons from aft to front, alternating each side. Trimmed upper forward cross tie by 1/4″ and clecoed into place

Hours Worked: 2.10


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *