SNB-C02: Rudder System

  • Rudder System Prep – Part 2

    Rudder System Prep – Part 2

    Removed forward fuselage floor for better access to rudder pedals then removed rudder pedals and mounting blocks. Used die grinder to remove powder coating from pivot points on rudder pedals. Created cable adjusters from aluminum bar stock. Hours Worked: 1.62

  • Rudder System Prep – Part 1

    Rudder System Prep – Part 1

    Cut rudder pedal pivot blocks from Phenolic sheet. Matched similar blocks together and rough sanded. Clamped blocks together then drilled mount holes with drill press. Temporarily bolted blocks together and sanded edges flat. Marked holes for rudder pedals then through drilled with Forstner bit. Deburred all holes and final sanded through holes. Hours Worked: 1.67