SNB-F12: Forward Side Panels
-
Fuselage Side Panels – Part 6
Up drilled LH forward side panel then disassembled and deburred/cleaned all parts. Clecoed assembly back together and installed rivets per plans. Installed AN525 hardware as called out in plans and torqued to spec. F12-01L and F12 complete! Hours Worked: 5.00
-
Fuselage Side Panels – Part 5
Disassembled RH forward side panel and deburred/cleaned all parts. Clecoed assembly back together and installed rivets per plans. Installed AN525 hardware as called out in plans and torqued to spec. F12-01R complete. Hours Worked: 3.97
-
Fuselage Side Panels – Part 4
Up drilled RH fuselage side panel including bolt holes per plans. Hours Worked: 1.48
-
Fuselage Side Panels – Part 3
Located and pilot drilled F14-01L assembly to LH side panel. Located and pilot drilled LH upper and lower motor mounts. Marked centerlines for gussets and located and pilot drilled all LH gussets. Located and pilot drilled F15-03L rudder pedal mount assembly. Located and pilot drilled F14-12L seat belt angle to LH fuselage side. Went back…
-
Fuselage Side Panels – Part 1
Located and pilot drilled lower longerons on LH/RH fuselage side assemblies. Located and clecoed upper longerons and miscellaneous side angles to fuselage sides. Determined -11L/R Gear Attach Angles had pilot holes drilled in wrong spot so remade them from 1x1x0.125×96 6061 angle. Hours Worked: 2.90
-
Fuselage Side Panels – Part 2
Located F14-01R forward angle and pilot drilled to RH side panel. Located and pilot drilled lower and upper RH motor mounts. Marked centerlines for gussets and located and pilot drilled all RH gussets. RH fuselage side panel all pilot drilled. Hours Worked: 1.87