SNX-F25: Aft Side Panels
-
Aft Fuselage Side Panel Assembly – Part 5
Began final assembly of side panels by deburring, scotchbriting and cleaning all F25 parts. Started by riveting rudder cable fairlead mount blocks to vertical channels #1 and #5. Riveted lower longerons to aft fuselage side skins along with vertical channels #2-#5. Left vertical channel #1 just clecoed for now. Left top row of rivets on…
-
Aft Fuselage Side Panel Assembly – Part 4
Up drilled holes in side skin and lower splice plates for AN525 bolts. Hours Worked: 0.52
-
Aft Fuselage Side Panel Assembly – Part 3
Up drilled left and right aft fuselage side panels to #30. Both panels up drilled for rivets per B-model plans. Did not up drill lower splice plate bolt holes. Hours Worked: 0.80
-
Aft Fuselage Side Panel Assembly – Part 2
Attached lower and upper longerons to RH aft side skin and pilot drilled all holes. Aligned and pilot drilled vertical channels #2 – #5 on both LH and RH aft side panels. Waiting on parts to pilot drill #1 vertical channels and splice plates. Left out hardware for now. Top edge of vertical channels aligned…
-
Aft Fuselage Side Panel Assembly – Part 1
Aligned upper longeron to LH aft side skin per plans and pilot drilled. Longeron set back 1/32″ from forward skin bend line and flush with top of skin. Lower longeron aligned along bottom edge of LH aft side skin using skin simulator to offset longeron for bottom skin. Also set back lower longeron 1/32″ from…