Inspection of previous work and removal of tip ribs for surface tip installation. Hole issues found in forward Spar and tip Rib. Will need to replace rib tip and create doubler for spar Hours Worked: 1.80
-
-
-
-
-
Tail Tip Mount
Removal of top rib to attach tip doubler and installation of T14-04 rib. Temp clecoed pending rudder installation Hours Worked: 2.47
-
Vertical Stabilizer Inspection – Part 5
Manufacture -03 and inspect existing work. Resulted in assemblies -01 and -02 Hours Worked: 0.94
-
Vertical Stabilizer Inspection – Part 1
Inspect vertical stabilizer parts. Was able to see most of the parts externally but obviously not able to inspect internal components like clips. Work observed externally appears to be fine. Hours Worked: 0.40
-
Vertical Stabilizer Inspection – Part 3
Inventory of completed and installed vertical stabilizer parts. All previous work Hours Worked: 0.80
-
Vertical Stabilizer Inspection – Part 2
Inspection of vertical stabilizer skin. Holes and fit look to be good. Slight damage notated on front right lower edge of stabilizer. Hours Worked: 0.10
-
Vertical Stabilizer Inspection – Part 4
Inspection of previously completed work Hours Worked: 0.50
-
Rudder Issues
Removed rudder from vertical tail assembly to inventory parts and inspect via camera. Determined that rudder is twisted and will need to replace skin. Hours Worked: 4.30