Category: Tail
-
Tail Spar Reinforcement
Creation of doubler to account for edge violations in forward Spar. Decided that drilling out and replacing forward Spar would be too much work so created doubler to go on back side
-
Tail Inspection – Part 6
Inspection of previous work and removal of tip ribs for surface tip installation. Hole issues found in forward Spar and tip Rib. Will need to replace rib tip and create doubler for spar
-
Tail Tip Mount
Removal of top rib to attach tip doubler and installation of T14-04 rib. Temp clecoed pending rudder installation
-
Vertical Stabilizer Inspection – Part 5
Manufacture -03 and inspect existing work. Resulted in assemblies -01 and -02
-
Vertical Stabilizer Inspection – Part 1
Inspect vertical stabilizer parts. Was able to see most of the parts externally but obviously not able to inspect internal components like clips. Work observed externally appears to be fine.