SNX-T02: Horizontal Tail Assembly
-

Final Tail Installation – Part 2
Removed piano hinges installed in elevator during paint process and reamed out hinge loops. Installed elevator onto fuselage and horizontal stabilizer with piano hinges. Drilled cotter pin holes in hinge loops per plans and installed cotter pins. T02 complete! Hours Worked: 1.72
-

Vertical Stabilizer Tips – Part 2
Finished riveting left side tip rib, and tip doubler along with rough fiberglass work. Created right side tip doubler and did rough fiberglass work. T02 complete other than final hinge installation and cotter pin installation Hours Worked: 6.32
-

Vertical Stabilizer Tips – Part 1
Replacement of left vert stabilizer tip and fiberglass work Hours Worked: 3.00
-

Tail Inspection – Part 6
Inspection of previous work and removal of tip ribs for surface tip installation. Hole issues found in forward Spar and tip Rib. Will need to replace rib tip and create doubler for spar Hours Worked: 1.80