2x2x0.125×96 Angle
-
Firewall Prep – Part 2
Creation of -02L/R, -04L/R, -07L/R, -11L/R, and -12L/R per legacy plans out of aluminum angle stock. Hours Worked: 5.96
-
Fuselage Box Part Prep
Creation of miscellaneous aft fuselage parts per legacy plans by cutting angle stock, drilling pilot holes, and riveting -02 aft shear web assembly. -07 spacers relocated from Box 1 to WB-3L. Hours Worked: 2.48
-
Aileron Bellcranks – Part 2
Cut new blanks for -03 and -04 and cut out angles. Mated together angles and up drilled bolt hole through -05 spacer block. Symmco bushings are just a little loose in holes so will need to apply Loctite 638 before final assembly. Hours Worked: 1.34
-
Aileron Bellcranks – Part 1
Cut blanks and made templates for -03, -04, -06, and -07 angles. Made an error drilling holes for -03 and -04 angles and will need to scrap angles and create two more blanks Hours Worked: 2.67
-
Wing Conversion Work – Part 4
Manufacture of wing conversion parts Hours Worked: 4.36
-
Wing Conversion Work – Part 3
Manufacture of wing conversion parts Hours Worked: 1.75
-
Wing Conversion Kit Inventory
Inventory of Sonex’s Wing Conversion Kit for legacy aircraft Hours Worked: 1.31