AN3-6A
-
Forward Fuselage Assembly – Part 6
Clecoed lower floor/firewall stiffener and floor stiffener into place. Deburred upper firewall and riveted to fuselage box. Deburred forward fuselage floor and clecoed into place. Will wait until very end to rivet floor into place. F11 complete! Hours Worked: 1.42
-
Turtledeck Assembly – Part 8
Riveted formers #5 through #2 to turtledeck skin starting at upper longerons and moving towards the skin splice channel. Riveted lower #1 formers to back of cross tie box then riveted upper #1 formers to turtledeck skin assembly. Riveted F20-08 splice plate to upper skin splice channel and #1 formers. Wrapped up #1 former section…
-
Aileron Bellcranks – Part 5
Used Loctite 638 retaining compound to hold Symmco bearings into place; worked very well. Assembled together angles to create pivot assembly then added -10 bell crank assembly and completed final riveting onto -01R to complete #9 rib assembly. Will let Loctite harden before greasing with white lithium per plans. Hours Worked: 1.71
-
Aileron Bellcranks – Part 3
Machined -06 and -07 angles from template and press fit Symmco bearings to create -02L assembly. (8) -09 clips cut from Z01-03 stock, drilled and completed, and -13/-14 channels cut (but not yet drilled). Hours Worked: 3.75
-
LH Main Spar Assembly – Part 6
Bolts inserted into LH spar and torqued. LH Main spar complete! Spar test fit and final drilling of alignment holes and wing attach blocks will be separated into WC02 task Hours Worked: 3.00
-
RH Main Spar Assembly – Part 9
Completion of the riveting and bolting of the RH spar. Rivets finished, blemishes primed, and all attach angles bolted and final torqued. Did not bolt spar blocks on and clecoed left in tip web. Hours Worked: 5.75