AN310-4

  • Rudder Control System – Part 2

    Rudder Control System – Part 2

    Heated up C01-03 rudder spring stock with propane torch and bent springs to specs in plans. Previously tried to bend springs without heat and spring steel broke rather than bent. After installing springs into fuselage, discovered that plan dimensions were a little long and resulted in rudder pedals not returning to neutral. Shortened springs by…

  • Elevator Control System – Part 1

    Elevator Control System – Part 1

    Temporarily installed control stick assembly. Pressed SF-812-3 bushings into stick to idler bar and control frame then installed idler hardware permanently and stick hardware temporarily. Verified freedom of movement and clearances with idler bar. Pressed bushing into elevator push rod ends, clecoed forward pushrod support to cross ties, and checked clearance of elevator push rod.…

  • Tailwheel Installation – Part 2

    Tailwheel Installation – Part 2

    Deburred tail wheel and spring holes and installed AN4 hardware through tail wheel assembly. Reinstalled clecoes on aft fuselage floor and took off of saw horses. Rolling chassis complete! Hours Worked: 1.26

  • Initial Kit Inventory – Part 2

    Initial Kit Inventory – Part 2

    Inventory most of kit. Still need to organize tools and parts in small boxes Hours Worked: 8.50