AN365-428A
-
Main Landing Gear Installation – Part 3
Drilled motor mount hole in new RH gear leg same as previous but used V block in drill press to ensure squareness. Deburred hole and attached new RH gear leg to fuselage with AN4-30A bolt. Drilled 1/8″ pilot hole through new RH axle (one side only). Setup axle toe-in jig by clamping aluminum angle to…
-
Main Landing Gear Installation – Part 1
Started by setting up drill press to drill titanium legs. Opted to not trim gear legs and left the 1/8″ longer than plans. Drilled main gear legs using slowest speed on drill press and 1/8″ cobalt drill bit. After initial holes were drilled, updrilled holes to 1/4″. Deburred and sanded main gear leg holes in…
-
Main Wing Spar Mating – Part 2
Inventory of Aircraft Spruce order and installation of the final rig plate bolt in the RH spar. W08 now complete Hours Worked: 0.74