AN365-428A
-
Tail Installation – Part 1
Began tail surface installation by moving tail surfaces from house to hangar. Discovered that horizontal stabilizer skins were installed upside down and that the bottom skins would need to be trimmed to fit around fuselage tail cone. Using the top side skin as a reference, trimmed bottom skin to clear fuselage tail cone. Will need…
-
Main Landing Gear Installation – Part 3
Drilled motor mount hole in new RH gear leg same as previous but used V block in drill press to ensure squareness. Deburred hole and attached new RH gear leg to fuselage with AN4-30A bolt. Drilled 1/8″ pilot hole through new RH axle (one side only). Setup axle toe-in jig by clamping aluminum angle to…
-
Main Landing Gear Installation – Part 1
Started by setting up drill press to drill titanium legs. Opted to not trim gear legs and left the 1/8″ longer than plans. Drilled main gear legs using slowest speed on drill press and 1/8″ cobalt drill bit. After initial holes were drilled, updrilled holes to 1/4″. Deburred and sanded main gear leg holes in…
-
Main Wing Spar Mating – Part 2
Inventory of Aircraft Spruce order and installation of the final rig plate bolt in the RH spar. W08 now complete Hours Worked: 0.74