Elevator and Rudder Rigging
Connected rudder cables to rudder horn per plans and installed rudder cable fairings on fuselage. Installed hardware for elevator push rod and lubricated bushing with LPS-1. Riveted SNB-F23-09 pushrod assembly to fuselage and verified freedom of movement in elevator control system. Hours Worked: 1.05

Flap Rigging
Began rigging flaps for final installation by trimming flap pushrod length from 3″ to 2″ to allow more adjustment of rod ends. Removed flap motor from drive tube for easier access and started by testing position of LH flap. Adjusted lower pushrod end to achieve full-up flap neutral position of 2 59/64″ measured from the…