AN530-4-6 (PK screw)

  • Aft Fuselage Side Panel Assembly – Part 5

    Aft Fuselage Side Panel Assembly – Part 5

    Began final assembly of side panels by deburring, scotchbriting and cleaning all F25 parts. Started by riveting rudder cable fairlead mount blocks to vertical channels #1 and #5. Riveted lower longerons to aft fuselage side skins along with vertical channels #2-#5. Left vertical channel #1 just clecoed for now. Left top row of rivets on…

  • LH Wing Assembly – Part 12

    LH Wing Assembly – Part 12

    Finished riveting lower side of LH wing including aft and forward skins. Installed aileron bell crank inspection cover plate using PK screws. LH wing complete! Hours Worked: 1.33

  • RH Wing Assembly – Part 11

    RH Wing Assembly – Part 11

    Finished up RH wing assembly by riveting forward wing skin onto wing. Started with top side, riveted entire side (starting at main spar then working to leading edge) then flipped wing and repeated process on bottom side. Left forward-most row of rivets on top side until bottom side of wing skin was clecoed into place.…

  • RH Wing Assembly – Part 9

    RH Wing Assembly – Part 9

    Bolted and riveted RH root rib assembly into place. Bolts in rear spar removed to allow riveting of the aft root rib to the rear spar attach angle. Deburred all holes in upper and lower aft wing skins. Both sides scotchbrited and cleaned with acetone. Wing tiedown bolt installed in main wing spar mount and…