SNB-C02-10

  • Rudder Control System – Part 1

    Rudder Control System – Part 1

    Installed rudder pedals and mount blocks into fuselage. Applied white lithium grease to rudder pedals before tightening rudder pedal mount blocks. Fed rudder cables through aft fuselage and temporarily installed AN23 clevis pins into rudder horn. Installed cable fairleads into fairlead blocks. Bolted cable adjusters onto rudder pedals and marked LH cable adjuster hole per…

  • Rudder System Prep – Part 1

    Rudder System Prep – Part 1

    Cut rudder pedal pivot blocks from Phenolic sheet. Matched similar blocks together and rough sanded. Clamped blocks together then drilled mount holes with drill press. Temporarily bolted blocks together and sanded edges flat. Marked holes for rudder pedals then through drilled with Forstner bit. Deburred all holes and final sanded through holes. Hours Worked: 1.67