SNB-F13-06L
-
Fuselage Side Panels – Part 6
Up drilled LH forward side panel then disassembled and deburred/cleaned all parts. Clecoed assembly back together and installed rivets per plans. Installed AN525 hardware as called out in plans and torqued to spec. F12-01L and F12 complete! Hours Worked: 5.00
-
Forward Fuselage Longerons
Creation of -06L/R lower longerons per B Model plans from 1x1x0.125 6061 angle. Hours Worked: 0.72