SNB-F14-01R
-
Fuselage Side Panels – Part 5
Disassembled RH forward side panel and deburred/cleaned all parts. Clecoed assembly back together and installed rivets per plans. Installed AN525 hardware as called out in plans and torqued to spec. F12-01R complete. Hours Worked: 3.97
-
Firewall Prep – Part 3
Created -03R cowling attach hinge from MS20257P4 piano hinge. Located hinge and firewall attach angle per Model B plans and pilot drilled -01R assembly. Verified alignment with spare hinge pin. Hours Worked: 0.65