SNB-W14-01L

  • LH Wing Assembly – Part 11

    LH Wing Assembly – Part 11

    Deburred LH flap and aileron hinge halves and clecoed into place. Clecoed top of LH forward wing skin into place then flipped wing and ratcheted lower side into place. LH root doubler clecoed into place on top. Clecoed lower side into place. Re-flipped LH wing and riveted upper aft and upper half of forward wing…

  • LH Wing Rib Assembly – Part 4

    LH Wing Rib Assembly – Part 4

    Completed assembly of LH wing rib installation by prepping and riveting forward and aft ribs #6 – #12. Rear spar deburred, cleaned, and riveted to rib assembly. LH aft root rib riveted to rear spar. Hours Worked: 3.49