SNX-F14-11L
-
Fuselage Side Panels – Part 6
Up drilled LH forward side panel then disassembled and deburred/cleaned all parts. Clecoed assembly back together and installed rivets per plans. Installed AN525 hardware as called out in plans and torqued to spec. F12-01L and F12 complete! Hours Worked: 5.00
-
Firewall Prep – Part 2
Creation of -02L/R, -04L/R, -07L/R, -11L/R, and -12L/R per legacy plans out of aluminum angle stock. Hours Worked: 5.96