SNX-F23-09

  • Elevator and Rudder Rigging

    Elevator and Rudder Rigging

    Connected rudder cables to rudder horn per plans and installed rudder cable fairings on fuselage. Installed hardware for elevator push rod and lubricated bushing with LPS-1. Riveted SNB-F23-09 pushrod assembly to fuselage and verified freedom of movement in elevator control system. Hours Worked: 1.05

  • Aft Fuselage Part Prep – Part 3

    Aft Fuselage Part Prep – Part 3

    Creation of -09 and -11 assemblies from channel stock. Since assemblies were simple, skipped documenting intermediate step of creating F23-10 and F23-13 support channels in build log. Following B model plans, took -01 tail wheel mount and drilled 3/16″ hole in bottom wall only of through tube. Hours Worked: 1.23