SNX-F23-09

Elevator and Rudder Rigging
Connected rudder cables to rudder horn per plans and installed rudder cable fairings on fuselage. Installed hardware for elevator push rod and lubricated bushing with LPS-1. Riveted SNB-F23-09 pushrod assembly to fuselage and verified freedom of movement in elevator control system. Hours Worked: 1.05

Aft Fuselage Part Prep – Part 3
Creation of -09 and -11 assemblies from channel stock. Since assemblies were simple, skipped documenting intermediate step of creating F23-10 and F23-13 support channels in build log. Following B model plans, took -01 tail wheel mount and drilled 3/16″ hole in bottom wall only of through tube. Hours Worked: 1.23

