SNX-F27-04L

  • Aft Fuselage Side Panel Assembly – Part 5

    Aft Fuselage Side Panel Assembly – Part 5

    Began final assembly of side panels by deburring, scotchbriting and cleaning all F25 parts. Started by riveting rudder cable fairlead mount blocks to vertical channels #1 and #5. Riveted lower longerons to aft fuselage side skins along with vertical channels #2-#5. Left vertical channel #1 just clecoed for now. Left top row of rivets on…

  • Aft Fuselage Side Panel Prep – Part 1

    Aft Fuselage Side Panel Prep – Part 1

    Creation of vertical channels (other than -01L/R per conversion plans). Created templates for Detail A and B from .022 scrap stock to speed up process. Drilled 3/4″ hole in -02R vertical channel in the wrong location and will order replacement from Sonex due to insufficient raw material for a spare. Cut blanks from Z03-04 and…