SNX-W15-02

  • LH Wing Rib Assembly – Part 3

    LH Wing Rib Assembly – Part 3

    Attached W17-01L assembly to main spar. Bolt direction altered from plans to account for rivet interference. Starting inboard and working outboard, attached forward and aft ribs 1-5 to main spar and riveted into place. Forward ribs scotchbrited, acetoned, deburred, and dimpled. Aft ribs scotchbrited, acetoned, and deburred. Aft-most lightning holes in forward ribs upsized to…

  • RH Wing Rib Assembly – Part 4

    RH Wing Rib Assembly – Part 4

    Completed prep and installation of #1 and #2 forward/aft ribs and installation onto main spar. Tubing support plate installed on both forward ribs. Dimpling skipped on #1 forward rib per plans in preparation of doubler installation. Hours Worked: 0.90

  • Wing Rib Gussets

    Wing Rib Gussets

    Determined pre-existing -06 and -07 gussets were from outdated plans and needed to be scrapped. New -06 and -07 gussets cut, drilled, and bent from template using scrap .025 sheet. Finished trimming -01 and -02 forward ribs and clecoed to spars. Hours Worked: 5.37