SNX-W21-01L

  • LH Wing Rib Assembly – Part 4

    LH Wing Rib Assembly – Part 4

    Completed assembly of LH wing rib installation by prepping and riveting forward and aft ribs #6 – #12. Rear spar deburred, cleaned, and riveted to rib assembly. LH aft root rib riveted to rear spar. Hours Worked: 3.49

  • Aileron Bellcranks – Part 4

    Aileron Bellcranks – Part 4

    Drilling of holes in -13L/R and -14L/R vertical channels. Both -10 bell crank assemblies created. Two washers per assembly needed to get castle nut aligned properly. Completed -01L including final riveting and lubrication of pivot with white lithium grease. -08 clip heights on vertical stiffeners set by using right angle from rib face. -01R clecoed…