SNX-W21-14R

  • Aileron Bellcranks – Part 4

    Aileron Bellcranks – Part 4

    Drilling of holes in -13L/R and -14L/R vertical channels. Both -10 bell crank assemblies created. Two washers per assembly needed to get castle nut aligned properly. Completed -01L including final riveting and lubrication of pivot with white lithium grease. -08 clip heights on vertical stiffeners set by using right angle from rib face. -01R clecoed…

  • Aileron Bellcranks – Part 5

    Aileron Bellcranks – Part 5

    Used Loctite 638 retaining compound to hold Symmco bearings into place; worked very well. Assembled together angles to create pivot assembly then added -10 bell crank assembly and completed final riveting onto -01R to complete #9 rib assembly. Will let Loctite harden before greasing with white lithium per plans. Hours Worked: 1.71