SNX-Z01-03 (96)
-
Aileron Bellcranks – Part 3
Machined -06 and -07 angles from template and press fit Symmco bearings to create -02L assembly. (8) -09 clips cut from Z01-03 stock, drilled and completed, and -13/-14 channels cut (but not yet drilled). Hours Worked: 3.75
-
Wing Rib Prep – Part 2
Finished making -07 gussets and proceeded to prep aft wing ribs. All ribs prepped minus #9 aileron bell crank ribs. Test fit all ribs to spars and fit looks good; needed to do some slight trimming of -05 ribs to clear spar caps. Ribs #1 – #4’s gussets clecoed in place and need to be…
-
Previous Wing Work Inspection – Part 3
Verification of previous work and manufacture of -06 and -07 Hours Worked: 1.19
-
Previous Wing Work Inspection – Part 1
Verification of previous work and prep for B-model conversion. Creation of -05L/R Hours Worked: 1.62