SNX-Z04-02 (96)
-
Aft Fuselage Part Prep – Part 1
Cut Z04-02 cross tie stock to create upper and lower cross ties. Radius’ in lower cross ties made with 1/4″ drill bit. Used legacy plans to create cross ties; no pilot holes drilled. Cut Z04-03 for lower Cross Tie #1 Hours Worked: 4.20