Drilled passthrough hole in LH tip web and installed Heyco 2030 snap busing. Installed left wing wiring harness for tip and landing light. Created connectors LW01 and LW02 (DT style) and wired landing light. Landing light ops check good. Wrapped wiring harness near outboard vertical stiffener with shrink tube and placed tape on stiffener to prevent rubbing. Updated wiring diagram and connector table.






Hours Worked: 1.50
Leave a Reply