Marked mounting holes in pitot mount and tube; two per side. Drilled pilot holes with #36 drill bit. Upsized mount holes to #25 for #6 screws. Carefully tapped pitot head with 6-32 tap through mounting pads. Front left hole had screw break off inside so needed to (mostly) drill out and redrill slightly lower. Mount holes deburred and temporarily attached to pitot head with 6R4 screws. Mount assembly complete (minus paint on mount)




Hours Worked: 1.32
Leave a Reply