Located and pilot drilled new SNB-F26-04L/R upper splice plates to upper longerons based off of skin bend line. Located and final drilled cable fairlead blocks to #1 vertical channels. Verified alignment with rudder cable holes in vertical channels.





Hours Worked: 0.45
Leave a Reply