Panel Installation – Part 5

Located GPS175 tray brackets onto tray and marked hole locations. Drilled screw holes into side brackets then installed 8-32 nutplates. Attached brackets to tray and mocked up location on panel backer. Updrilled bracket attach holes then prepped brackets and panel backer for flush rivets. Riveted GPS175 mounting tray to panel backer. Drilled out holes for flap switch and power outlet in right side of panel and checked fitment. Also drilled smaller anti-rotation hole in panel backer for flap switch.

Hours Worked: 2.30


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *