Built paint hangar stands for hanging control surfaces during painting out of scrap 2×4, 4×4, and 3/4″ EMT.

Hours Worked: 1.27
Build Log for Sonex 0849B
Built paint hangar stands for hanging control surfaces during painting out of scrap 2×4, 4×4, and 3/4″ EMT.
Hours Worked: 1.27
Leave a Reply