Installed mixture cable into center panel section and routed cable through previously installed cable safe. Measured out approximate length and removed inner cable from jacket (making sure to carefully catch ball in cable mechanism). Trimmed outer jacket then upsized cable hole in AeroInjector to 1/4″. Installed AeroInjector back onto back side of motor and ran throttle and mixture cables back. Trimmed mixture cable to generate 90 degrees of rotation on the fuel lever per the manual. Ops checked both controls. Installed trim knob onto center section of panel; will secure trim cable once side panels are in place. Continued working on engine install checklist by removing the front lower flange of the oil cooler to clear the cowling. Made oil cooler mounts out of aluminum angle and bolted to the back of the oil cooler. Secured oil cooler baffle to top mount screws.










Hours Worked: 3.80
Leave a Reply