Cowl Fiberglass Work – Part 7

Rough sanded aft edge of upper cowl then pinned into place on fuselage. Further sanded cowl on fuselage to get spacing correct. Removed upper cowl and sanded transition line with 120 grit. Removed lower cowl to trim prop hub area and prep a few small spots for epoxy. Reinstalled cowls and secured into place. Prepped upper and lower cowl for epoxy and used stiff micro mixture to fill low spots and patch miscellaneous holes and scuffs on both upper and lower cowl.

Hours Worked: 2.35


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *