Baggage Compartment Wrap-up

Cut 0.025″ aluminum sheet and extra SNX-Z03-02 stock to create elevator pushrod cover in baggage compartment. Riveted pieces together then installed Velcro strips on baggage compartment floor and cover. Installed pushrod tunnel and verified no interference with flight controls. Cut rear baggage compartment covers out of 0.025″ sheet and attached to #2 former structure with Velcro strips. Routed seatbelts through upper baggage compartment cover then attached cover with provided Velcro strips.

Hours Worked: 2.87


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *