Created mount angle for EMS and ARINC module from scrap 0.032 sheet due to lack of clearance for modules with connectors on both ends. Riveted nut plates to vertical mount and then riveted mount to avionics shelf. Laid out backup battery, wig wag module, and fuel probe box onto shelf and marked mounting holes. Installed nut plates for components then mounted items to shelf. Installed Dynon EMS and ARINC modules onto bracket using stacking kit to save space. Created DT connector harness for wig wag module then finished running wires for landing lights. Also ran strobe sync wire as well. Installed fuel probe box onto avionics shelf then ran new ground from base of probe to box mounting hole and co-located box ground to the same place. Added Molex connector for fuel probe power and signal.









Hours Worked: 4.97