Tail Cone Box Wrapup

Riveted turtledeck assembly to fuselage tail cone box per plans revision E. Up drilled holes through side skins and upper splice plates to 3/16″ and installed AN525 hardware. Torqued to spec. Clecoed crosstie closeout plate into place and riveted into place. Clecoed flap motor actuator mounts into place and verified alignment with flap drive tube by temporarily installing flap motor. Alignment was good so riveted flap motor mounts to crosstie assembly per plans revision E. Clecoed aft fuselage floor into place and verified squareness of fuselage tail cone assembly. Clecoed F27-07 spacers into place. F18 complete!

Hours Worked: 3.68