SNB-F09: Aft Lower Cabin

  • Aft Forward Fuselage Assembly – Part 4

    Aft Forward Fuselage Assembly – Part 4

    Disassembled seat pans/channels to deburr and clean. Riveted seat pans and channels together then clecoed into fuselage. Riveted rear of assembly to aft seat belt channel and left clecoes in for center seatbelt channels and aft tunnel web spar per plans. Deburred new holes in forward fuselage floor then clecoed back onto fuselage. F09 complete!…

  • Aft Forward Fuselage Assembly – Part 3

    Aft Forward Fuselage Assembly – Part 3

    Used rivet stems and clamps to hold center seatbelt channels into place while locating and pilot drilling seat ribs and channels to forward floor. Clecoed -14L/R angles into place. Located idler assembly and pilot drilled to lower cross member and seat belt attach assembly. Updrilled all holes in fuselage floor then removed floor for better…

  • Aft Forward Fuselage Assembly – Part 2

    Aft Forward Fuselage Assembly – Part 2

    Pilot drilled and clecoed seat ribs and channels to fuselage floor. Clecoed together seat belt clips, attach channels, and seatbelt center channel and attached to inside seat pan ribs. Hours Worked: 0.82

  • Aft Forward Fuselage Assembly – Part 1

    Aft Forward Fuselage Assembly – Part 1

    Following general construction order on plans, assembled -02 seat belt assembly and riveted. Fist assembly to fuselage and temporarily clecoed F10-02 angle to assembly to ensure straightness. Pilot drilled and clecoed assembly to side panels and floor. Determined SNB-F10-25 gusset spacers were the incorrect thickness so modified SNX spacers to work. Located spacers and gussets,…