Rudder Rebuild – Part 7
Finish creation of vertical tip mounting flange and final riveting of vert stabilizer assembly.
-
Rudder Rebuild – Part 6
Finished riveting upper hinge half and began test fitting fiberglass tip and making extra flange for removable tip. Planning on getting tip rough fitted and fasteners made and then doing final fiberglass work later down the road
-
Rudder Rebuild – Part 5
Removed existing rudder hinge half from vertical stabilizer, remade, and clecoed into place. Final riveting and tine adjustment still needed
-
Rudder Rebuild – Part 4
Completed assembly of the rudder including final drilling and riveting. Discovered Hinge Half on vertical stabilizer is misaligned and will need to be replaced and refitted
-
Rudder Rebuild – Part 3
Continued to work on rudder skin pre-drilling. 2 of 3 ribs pre-drilled and test fitted. Rudder horn rib remaining
-
Tail Tip Mount
Removal of top rib to attach tip doubler and installation of T14-04 rib. Temp clecoed pending rudder installation