AN363-624

  • Initial Prop Installation

    Initial Prop Installation

    Began initial prop installation by enlarging holes in Jabiru prop bushings from 1/4″ to 3/8″ using drill press. Verified holes in prop did not need any reaming but needed to ream holes in spinner slightly to allow for smooth bolt installation. Bolted prop and spinner to prop flange using AN6 hardware and AN363 lock nuts.…