E-04 [48244]

  • ELT Installation

    ELT Installation

    Located and drilled hole for ELT antenna on aft portion of turtle deck. Secured antenna to fuselage then routed and connected coax cable from antenna to ELT. Cut hole in RH #1 former for RCPI and drilled mounting holes. Installed vertical faceplate and A544 alkaline battery into RCPI (battery expires 06/19/2031) then mounted RCPI onto…