Heyco 2030
-
LH Wing Wiring
Drilled passthrough hole in LH tip web and installed Heyco 2030 snap busing. Installed left wing wiring harness for tip and landing light. Created connectors LW01 and LW02 (DT style) and wired landing light. Landing light ops check good. Wrapped wiring harness near outboard vertical stiffener with shrink tube and placed tape on stiffener to…
-
LH Wing Rib Assembly – Part 4
Completed assembly of LH wing rib installation by prepping and riveting forward and aft ribs #6 – #12. Rear spar deburred, cleaned, and riveted to rib assembly. LH aft root rib riveted to rear spar. Hours Worked: 3.49
-
LH Wing Rib Assembly – Part 3
Attached W17-01L assembly to main spar. Bolt direction altered from plans to account for rivet interference. Starting inboard and working outboard, attached forward and aft ribs 1-5 to main spar and riveted into place. Forward ribs scotchbrited, acetoned, deburred, and dimpled. Aft ribs scotchbrited, acetoned, and deburred. Aft-most lightning holes in forward ribs upsized to…
-
RH Wing Wiring
Created grounding lug in RH Rib #12 for tip light and landing light. Created RH wing wiring harness and routed through snap bushing in lightning holes and tubing support plates. Created new hole in main spar tip web to relocate connector aft of main spar. Maintenance loops created in pitot wiring harness and landing light…
-
Root Rib Prep – Part 2
Disassembled RH forward and aft root ribs and angles, prepared holes and ribs, and riveted parts together. Assembly ready for installation on main spar Hours Worked: 0.85
-
RH Wing Rib Assembly – Part 3
Took apart RH wing box down to spars. Deburred and cleaned both main and rear spar. Began assembling wing ribs starting from #12 and working inboard. Deburred all holes in both forward and aft ribs, scotchbrited scratches, and cleaned with acetone. Forward ribs had holes dimpled for forward skin. Forward/Aft ribs #3-#12 complete. Lightning holes…