K1000-6

  • Brake System Assembly – Part 1

    Brake System Assembly – Part 1

    Prepped wheel pant mount plates by marking new holes and cut-outs. Drilled mount holes and used combination of files and rotary tool for brake line hardware cut outs. Riveted nutplates onto outside of plates for wheel pant hardware. Assembled brake bodies to brass hardware using Teflon paste. Verified alignment of parts then installed brake assemblies…

  • LH Landing Light – Part 3

    LH Landing Light – Part 3

    Laid out landing light template on LH wing and trimmed opening for landing light lens. Cleaned up edges with rotary tool and scotchbrite pads. Created upper retaining bracket and riveted into place. Created lower retaining bracket and temporarily secured with #6 screws. Opted to not use flush screws on lower retaining bracket. Hours Worked: 2.58

  • RH Wing Wiring

    RH Wing Wiring

    Created grounding lug in RH Rib #12 for tip light and landing light. Created RH wing wiring harness and routed through snap bushing in lightning holes and tubing support plates. Created new hole in main spar tip web to relocate connector aft of main spar. Maintenance loops created in pitot wiring harness and landing light…